M1030-E Series Tonnage Monitor Part Numbers
M1030
Press Load Monitor/Peak Tonnage or Signature Analysis System
|
||
1.
M1030 PLS
|
||
1.1 1030 PLM:
|
||
SAC-M1030-PLMx
|
Programmable Load (Peak
Tonnage) Monitor (Resolver is not required)
|
|
Where x = Number of
Inputs
|
||
2:
|
Two channel
|
|
4:
|
Four channel
|
|
|
Eight channel (consult
factory for availability)
|
|
1.2 M1030 Signature
Analysis:
|
||
SAC-M1030-RD4
|
Base unit for tonnage at
angle for up to 4 sensors. Relays are included for Q, D, and P outputs.
|
|
SAC-M1030-R08
|
Base unit for tonnage at
angle for up to 8 sensors. Relays are included for Q, D, and P outputs.
|
|
SAC-M1030-GR4
|
Base unit for 4 sensors
with Graphic Communication Link for On-Line Monitoring and Profile Management
|
|
SAC-M1030-GR8
|
Base unit for 8 sensor
with Graphic Communication Link for On-Line Monitoring and Profile
Management.
|
|
SAC-M1030-GM04
|
Base unit for 4 sensors
with Graphic Communication Link for On-Line and Critical Curve Monitoring.
|
|
SAC-M1030-GM08
|
Base unit for 8 sensors
with Graphic communication Link for On-Line and Critical curve Monitoring.
|
|
Slave Unit
|
S:
|
For M1030 Signature
Series, change the “A” in SAC (in above parts) to “S”
|
2.
Sensors, Amplifiers, Cables and Installation Kits
|
||
2.1 Select strain gauge
or amplifiers needed:
|
||
SAC-M1030-SEND
|
1 strain gauge sensor
with amplifier assembly, box and cover, 2 torque pads and 4 mounting screws ¼
- 28 x ¾” socket head cap
|
|
SAC-M1030-SENW
|
1 strain gauge sensor
with amplifier assembly, box cover, 2 weld pads, 2 torque pads, and 4
mounting screws (1/4 – 28 x ¾” socket head cap)
|
|
ASY-M1030-AMPD
|
Retro-fit amplifier
assembly includes amplifier assembly for die sensors, screw terminals for
sensor connection
|
|
ASY-M1030-AMP
|
Retro-fit amplifier
assembly includes Amplifier assembly mounted on standard cover, screw
terminals for sensor connection
|
|
ASY-M1030-STG
|
Strain Gauge Element,
with connector for Autotech’s Amplifier Assembly
|
|
2.2 Select Installation
kit needed:
|
||
KIT-M1030-INSTL
|
Installation kit
includes Gauge block and temporary mounting screw, #8 HS drill bit, ¼ - 28 NF
tap, and 4 temporary weld pad mounting screws
|
|
KIT-M1030-TORQ
|
Torque Pads (2), and
mounting screws (4) ¼ x 28 x ¾”
|
|
KIT-M1030-WELD
|
Weld Pads (2), and
temporary screws (4) ¼ - 28 x 1”
|
|
CBL-10T22-Cxxx
|
Recommended shielded
cable for the sensor wiring and Graphic Communication Link. (Where xxx is
length in ft.) Length ordered must be 010, 020, or 050 feet and increments of
50 ft.
|
|
3.
Serial Communication Software, Cables and Communication Adapter, IBM
Compatible
|
||
3.1 Serial Communication
Software:
|
||
SAC-M1030-SOFT
|
“PC” software used in
conjunction with the Graphic Communication Link
|
|
SAC-M1030-SFTGM
|
“PC” software used in
conjunction with the Graphic Communication Link and Critical Curve
|
|
3.2 Serial Communication
Adaptor:
|
||
SAC-RS232-485T
|
Adaptor for RS232 to
RS485 required if an IBM compatible PC is used instead of T60
|
|
3.3 Serial Communication
Cables:
|
||
CBL-232MF-9Pxxx
|
Serial Cable for
connecting PC to RS232 port of RS232-485 adaptor (where xxx is length in ft.)
|
|
CBL-09S22-DAxxx
|
9-Conductor cable with
overall foil shield and DSub connector at one end. Used to connect RS 485
port on adapter to M1030 serial port (where xxx is length in ft.)
|
|
4.
Position Transducers
|
||
The M1030 Press Load
Monitor/Signature Analysis System requires a single turn resolver as an input
device, such as Autotech’s RL100, RL101, RL500, RL501, E1R, E7R, E8R or E9R
series of resolvers. Please see position transducer section for ordering
information on these resolvers and appropriate accessories.
|
Note: For Part Numbers and Price of individual components, cables & accessories, strain-gauge sensors & amplifiers, and other product variations such as additional PLM outputs, call the factory.